VME99 test stand IOC: Difference between revisions
Jump to navigation
Jump to search
(→VME99) |
(→VME99) |
||
Line 2: | Line 2: | ||
The concept of "VME99" is to integrate the firmware development test stand more fully as part of the experiments. The goal is to provide a system designed specifically for development of IOC software unique from any experimental system so that development work can proceed freely without risk to any running setup. | The concept of "VME99" is to integrate the firmware development test stand more fully as part of the experiments. The goal is to provide a system designed specifically for development of IOC software unique from any experimental system so that development work can proceed freely without risk to any running setup. | ||
==Hardware To Do== | |||
- Cable to setup a ''terminal'' without a terminal server. JTA will do this by end of 5/4/18. | |||
==Software To Do== | |||
- Implementation of config file into the Python scripts for building the system. | |||
Revision as of 19:13, April 30, 2018
VME99
The concept of "VME99" is to integrate the firmware development test stand more fully as part of the experiments. The goal is to provide a system designed specifically for development of IOC software unique from any experimental system so that development work can proceed freely without risk to any running setup.
Hardware To Do
- Cable to setup a terminal without a terminal server. JTA will do this by end of 5/4/18.
Software To Do
- Implementation of config file into the Python scripts for building the system.