Master: Difference between revisions

From GammaSphere DAQ
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
<imagemap>
<imagemap>
Image:MasterTriggerFigure.png|800px|center
Image:MasterTriggerFigure.png|800px|center
rect 49 286 133 307 [[Master Trigger CPLD Screen]]
rect 56 377 171 406 [[Master Trigger CPLD Screen]]
rect 297 237 381 258 [[SerDes Screen]]
rect 390 311 504 341 [[SerDes Screen]]
rect 864 376 949 398 [[Master Trigger Wheel Maps Options]]
rect 1152 499 1268 528 [[Master Trigger Wheel Maps Options]]
rect 851 410 976 440 [[Wheel RAM Control Screen]]
rect 1137 542 1304 587 [[Wheel RAM Control Screen]]
rect 849 452 978 473 [[Master Trigger Diagnostics Screen]]
rect 1133 602 1305 628 [[Master Trigger Diagnostics Screen]]
</imagemap>
</imagemap>


''Go back to [[Trigger Options]]''
''Go back to [[Trigger Options]]''

Revision as of 17:08, March 21, 2023

This screen gives controls and monitoring for the Master trigger of the DAQ system. The master trigger implements 11 bi-directional communications links. Each link (named A,B,C,D,E,F,G,H,L,R,U) is capable of transmitting data at 1Gbit/sec while simultaneously receiving data at 1Gbit/sec. The system connectivity is hierarchical. The master trigger communicates with router trigger modules within its detector system via links A-H, a master trigger module of another detector system via either link L or link R, and a MyRIAD module of another detector system via link U. The master trigger continuously transmits information to every module.

Master Trigger CPLD ScreenSerDes ScreenMaster Trigger Wheel Maps OptionsWheel RAM Control ScreenMaster Trigger Diagnostics ScreenMasterTriggerFigure.png
About this image

Go back to Trigger Options