Difference between revisions of "Detailed Steps for Tuning In-Flight Beams"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
Once steps for degraded beam tuning have been completed and a good focus is found at the RAISOR midplane (Separate detailed sheet for this), the steps below can be used to help guide the identification and tuning of the secondary beam. | Once steps for degraded beam tuning have been completed and a good focus is found at the RAISOR midplane (Separate detailed sheet for this), the steps below can be used to help guide the identification and tuning of the secondary beam. | ||
− | # Acquire information on primary/degraded beam tunes and prep for beam | + | # '''Acquire information on primary/degraded beam tunes and prep for beam''' |
## Ask for docs from operations on primary and degraded beam TOFs and the charge state and slit scan data to be loaded into BOX | ## Ask for docs from operations on primary and degraded beam TOFs and the charge state and slit scan data to be loaded into BOX | ||
## Acquire the final cup/collimator FC currents and any notes on degraded beam transmission | ## Acquire the final cup/collimator FC currents and any notes on degraded beam transmission | ||
Line 8: | Line 8: | ||
## Insert detector of choice, make sure HV and preamps are on and daq is alive w/ noise etc | ## Insert detector of choice, make sure HV and preamps are on and daq is alive w/ noise etc | ||
− | # Getting a reference spectrum from the degraded beam (can be done at RAISOR exit or target depending) | + | # '''Getting a reference spectrum from the degraded beam (can be done at RAISOR exit or target depending)''' |
## Cut back beam by x100 w/ slits (not RAISOR slits) first then insert all available attenuation (~x15 Million) + RAISOR Att if needed | ## Cut back beam by x100 w/ slits (not RAISOR slits) first then insert all available attenuation (~x15 Million) + RAISOR Att if needed | ||
## Place beam on detectors and slowly remove attenuation until rates are roughly >100 Hz & <500 Hz | ## Place beam on detectors and slowly remove attenuation until rates are roughly >100 Hz & <500 Hz | ||
## Take ref spectrum - optimize daq params and save the settings file as they should not be changed for the duration of the run | ## Take ref spectrum - optimize daq params and save the settings file as they should not be changed for the duration of the run | ||
− | ## Run the RAISOR midplane slits in to 2 - 3 mm gap and take another spectrum (better to have small slit spacing for BRho scans) | + | ## ''Run the RAISOR midplane slits in to 2 - 3 mm gap and take another spectrum (better to have small slit spacing for BRho scans)'' |
− | # Determine the RF Sweeper(R501)/R401 phases for degraded beam with known TOF | + | # '''Determine the RF Sweeper(R501)/R401 phases for degraded beam with known TOF''' |
− | ## Set degraded beam rate to few hundred Hz and get Grafana running | + | ## Set primary degraded beam rate to few hundred Hz and get Grafana running |
## Have operations turn on Sweeper to Voltage=2 and phase=0 to start (R401 is still off) | ## Have operations turn on Sweeper to Voltage=2 and phase=0 to start (R401 is still off) | ||
### Note: You already may see a reduction in the beam rate do not increase beam current to get back to few hundred Hz | ### Note: You already may see a reduction in the beam rate do not increase beam current to get back to few hundred Hz | ||
## Set the increment step = 1 degree, operators hold down increment to scan over 360 noting the phase every 10 - 20 degree | ## Set the increment step = 1 degree, operators hold down increment to scan over 360 noting the phase every 10 - 20 degree | ||
− | ## Document the phase that transmission is the highest | + | ## ''Document the phase that transmission is the highest for the primary degraded beam'' |
## Do smaller steps of ~1 degreed around the regions of the maxima (should be two that are similar one <180 one >180 deg) | ## Do smaller steps of ~1 degreed around the regions of the maxima (should be two that are similar one <180 one >180 deg) | ||
## Leave Sweeper(R501) at optimal phase, increase amplitude to 3,4,5,6V to see if improvement in transmission, note the best value. | ## Leave Sweeper(R501) at optimal phase, increase amplitude to 3,4,5,6V to see if improvement in transmission, note the best value. | ||
## Set Sweeper (R501) to optimal phase/amplitude | ## Set Sweeper (R501) to optimal phase/amplitude | ||
− | ### FYI: Phase B is the number that ops has been typically used when referring to the ' | + | ### ''FYI: Phase B is the number that ops has been typically used when referring to the phase'' |
## Turn on R401 to phase = 0, amp ~ 1.1 or 1.2 (below 0.9 seems to give it issues locking up) | ## Turn on R401 to phase = 0, amp ~ 1.1 or 1.2 (below 0.9 seems to give it issues locking up) | ||
## First scan phase, then scan amplitude similar to Sweeper to find optimal R401 parameters, note the values. | ## First scan phase, then scan amplitude similar to Sweeper to find optimal R401 parameters, note the values. | ||
− | ## TURN OFF THE SWEEPER AND R401 FOR NOW (or maybe only needs to have V=0??) | + | ## '''TURN OFF THE SWEEPER AND R401 FOR NOW (or maybe only needs to have V=0??)''' |
## Should be back to the few hundred Hz rate as at the beginning | ## Should be back to the few hundred Hz rate as at the beginning | ||
− | # Identify the secondary beam and optimal scale factor | + | # '''Identify the secondary beam and optimal scale factor''' |
## Have a good degraded beam spot in the detectors (SCALE = 1.0), w/ RF Sweeper and R401 OFF | ## Have a good degraded beam spot in the detectors (SCALE = 1.0), w/ RF Sweeper and R401 OFF | ||
### Best to have RAISOR slits set to 2 - 3 mm spacing only (typically they are 5 - 7 mm after RAISOR Proc.) | ### Best to have RAISOR slits set to 2 - 3 mm spacing only (typically they are 5 - 7 mm after RAISOR Proc.) | ||
### This can be done either with low primary beam on FCA001 or higher beam and RAISOR x100 or x1000 in (just document) | ### This can be done either with low primary beam on FCA001 or higher beam and RAISOR x100 or x1000 in (just document) | ||
− | ## Input current beam line values into ATLAS RAISOR Scaler Tool (make sure it is for the appropriate beam line) | + | ## ''Input current beam line values into ATLAS RAISOR Scaler Tool (make sure it is for the appropriate beam line)'' |
## Incrementally scale the RAISOR / beam line magnets in 0.5-1% steps (up or down depending) until 1% or so past expected scale value | ## Incrementally scale the RAISOR / beam line magnets in 0.5-1% steps (up or down depending) until 1% or so past expected scale value | ||
### At each step, remove attenuation to achieve the 100-500 Hz rates and searching for the beam of interest | ### At each step, remove attenuation to achieve the 100-500 Hz rates and searching for the beam of interest | ||
Line 41: | Line 41: | ||
### Calculate the rate of the isotope of interest as the pps / pnA [note: pnA value from FCA001 divided by q of primary beam] | ### Calculate the rate of the isotope of interest as the pps / pnA [note: pnA value from FCA001 divided by q of primary beam] | ||
− | # Optimize the secondary beam | + | # '''Optimize the secondary beam''' |
## Set beam of interest to optimal scale factor | ## Set beam of interest to optimal scale factor | ||
− | ## Put max current on FCA001 and RAISOR att in if needed (essentially as close to primary beam maximum on target as possible) | + | ## '''Put max current on FCA001 and RAISOR att in if needed (essentially as close to primary beam maximum on target as possible)''' |
− | ## Carry out procedure for optimizing the RF Sweeper and R401 as described above [Determine the RF Sweeper(R501)/R401 phases for degraded beam with known TOF] | + | ## '''Carry out procedure for optimizing the RF Sweeper and R401 as described above [Determine the RF Sweeper(R501)/R401 phases for degraded beam with known TOF]''' |
### There are a few options at this step: | ### There are a few options at this step: | ||
#### The RAISOR midplane slits may be opened to 5 - 7 mm gap if the purity is good enough prior to the phase scans | #### The RAISOR midplane slits may be opened to 5 - 7 mm gap if the purity is good enough prior to the phase scans | ||
#### Otherwise, the slits may be opened after finding the optimal settings for the secondary beam to see if rates are increased | #### Otherwise, the slits may be opened after finding the optimal settings for the secondary beam to see if rates are increased | ||
#### Finally, if secondary beam rate is too low relative to the total rate for a manual scan, we can calculate the expected phase and search nearby this theoretical value | #### Finally, if secondary beam rate is too low relative to the total rate for a manual scan, we can calculate the expected phase and search nearby this theoretical value | ||
− | ## Leaving the Sweeper / R401 settings at the optimal values, provide rates / purities etc. to operators for optimizing on the total rate | + | ## '''Leaving the Sweeper / R401 settings at the optimal values, provide rates / purities etc. to operators for optimizing on the total rate''' |
### Keep track of primary beam current at various points through tuning, RAISOR POC needs to help determine with discussions on ops/user sides when to stop tuning | ### Keep track of primary beam current at various points through tuning, RAISOR POC needs to help determine with discussions on ops/user sides when to stop tuning | ||
− | ## Once rates have been achieved, move to any other optimizations, i.e. beam spot etc. | + | ## '''Once rates have been achieved, move to any other optimizations, i.e. beam spot etc.''' |
# Document and Monitor | # Document and Monitor |
Revision as of 18:39, July 21, 2021
Overview of the steps for In-flight beam delivery
Once steps for degraded beam tuning have been completed and a good focus is found at the RAISOR midplane (Separate detailed sheet for this), the steps below can be used to help guide the identification and tuning of the secondary beam.
- Acquire information on primary/degraded beam tunes and prep for beam
- Ask for docs from operations on primary and degraded beam TOFs and the charge state and slit scan data to be loaded into BOX
- Acquire the final cup/collimator FC currents and any notes on degraded beam transmission
- Note down RAISOR slit settings (in particular the midplane vertical slits are key)
- Insert detector of choice, make sure HV and preamps are on and daq is alive w/ noise etc
- Getting a reference spectrum from the degraded beam (can be done at RAISOR exit or target depending)
- Cut back beam by x100 w/ slits (not RAISOR slits) first then insert all available attenuation (~x15 Million) + RAISOR Att if needed
- Place beam on detectors and slowly remove attenuation until rates are roughly >100 Hz & <500 Hz
- Take ref spectrum - optimize daq params and save the settings file as they should not be changed for the duration of the run
- Run the RAISOR midplane slits in to 2 - 3 mm gap and take another spectrum (better to have small slit spacing for BRho scans)
- Determine the RF Sweeper(R501)/R401 phases for degraded beam with known TOF
- Set primary degraded beam rate to few hundred Hz and get Grafana running
- Have operations turn on Sweeper to Voltage=2 and phase=0 to start (R401 is still off)
- Note: You already may see a reduction in the beam rate do not increase beam current to get back to few hundred Hz
- Set the increment step = 1 degree, operators hold down increment to scan over 360 noting the phase every 10 - 20 degree
- Document the phase that transmission is the highest for the primary degraded beam
- Do smaller steps of ~1 degreed around the regions of the maxima (should be two that are similar one <180 one >180 deg)
- Leave Sweeper(R501) at optimal phase, increase amplitude to 3,4,5,6V to see if improvement in transmission, note the best value.
- Set Sweeper (R501) to optimal phase/amplitude
- FYI: Phase B is the number that ops has been typically used when referring to the phase
- Turn on R401 to phase = 0, amp ~ 1.1 or 1.2 (below 0.9 seems to give it issues locking up)
- First scan phase, then scan amplitude similar to Sweeper to find optimal R401 parameters, note the values.
- TURN OFF THE SWEEPER AND R401 FOR NOW (or maybe only needs to have V=0??)
- Should be back to the few hundred Hz rate as at the beginning
- Identify the secondary beam and optimal scale factor
- Have a good degraded beam spot in the detectors (SCALE = 1.0), w/ RF Sweeper and R401 OFF
- Best to have RAISOR slits set to 2 - 3 mm spacing only (typically they are 5 - 7 mm after RAISOR Proc.)
- This can be done either with low primary beam on FCA001 or higher beam and RAISOR x100 or x1000 in (just document)
- Input current beam line values into ATLAS RAISOR Scaler Tool (make sure it is for the appropriate beam line)
- Incrementally scale the RAISOR / beam line magnets in 0.5-1% steps (up or down depending) until 1% or so past expected scale value
- At each step, remove attenuation to achieve the 100-500 Hz rates and searching for the beam of interest
- Take a fixed time run with the daq to note rates / purities
- Generate cuts at each step to track the movement of the beam charge states etc. if needed
- Identify the isotope of interest based on calculated energies or previous production of the isotope
- Calculate the rate of the isotope of interest as the pps / pnA [note: pnA value from FCA001 divided by q of primary beam]
- Have a good degraded beam spot in the detectors (SCALE = 1.0), w/ RF Sweeper and R401 OFF
- Optimize the secondary beam
- Set beam of interest to optimal scale factor
- Put max current on FCA001 and RAISOR att in if needed (essentially as close to primary beam maximum on target as possible)
- Carry out procedure for optimizing the RF Sweeper and R401 as described above [Determine the RF Sweeper(R501)/R401 phases for degraded beam with known TOF]
- There are a few options at this step:
- The RAISOR midplane slits may be opened to 5 - 7 mm gap if the purity is good enough prior to the phase scans
- Otherwise, the slits may be opened after finding the optimal settings for the secondary beam to see if rates are increased
- Finally, if secondary beam rate is too low relative to the total rate for a manual scan, we can calculate the expected phase and search nearby this theoretical value
- There are a few options at this step:
- Leaving the Sweeper / R401 settings at the optimal values, provide rates / purities etc. to operators for optimizing on the total rate
- Keep track of primary beam current at various points through tuning, RAISOR POC needs to help determine with discussions on ops/user sides when to stop tuning
- Once rates have been achieved, move to any other optimizations, i.e. beam spot etc.
- Document and Monitor
- Note down RAISOR settings when needed
- Keep track of gas-cell temp pressure when applicable
- ...
Definitions
- primary beam - the beam species and charge state taken out of the source at the ATLAS energy requested
- degraded beam - the same beam species as the primary beam but at a different (lower) energy and most likely different (higher) charge state
- production target - the target put in place before RAISOR, e.g., Be foil or Gas Cell