Infl5: Difference between revisions
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
== Primary Beam (energy) [max pnA] + Target (thickness): == | == Primary Beam (energy) [max pnA] + Target (thickness): == | ||
* | * [Oct. 18] <sup>29</sup>Si<sup>8+</sup> (280 MeV)[~1 pnA] + D2 Gas w/ 1.9 mg/cm<sup>2</sup> HAVAR windows (3.7 cm, 1400 mbarr, T=290K) | ||
== Run Dates == | == Run Dates == | ||
*October 2018 | *October 2018 | ||
* Feb/March 2019 | * Feb/March 2019 |
Revision as of 17:03, February 26, 2019
Title:
- 30P(d,pgamma) for 30P(p,gamma) rates
PI (group):
- S. Pain (ORNL)
Secondary Beam:
- 30P
- Energy: ~247.5 MeV, 0.82849 Tm [Oct. 18]
- Requested rate: 5x105 pps [1x1055 pps available]
- Achieved rate (pps/pnA):
- [Oct. 18] (~3000-5000 pps/pnA) [0.098 pnA 29Si8+]
- [Feb. 19]
Primary Beam (energy) [max pnA] + Target (thickness):
- [Oct. 18] 29Si8+ (280 MeV)[~1 pnA] + D2 Gas w/ 1.9 mg/cm2 HAVAR windows (3.7 cm, 1400 mbarr, T=290K)
Run Dates
- October 2018
- Feb/March 2019